Research Article
Metro Timetabling for Time-Varying Passenger Demand and Congestion at Stations
Table 6
Computational performances for different methods.
| | RO method | Generic GA | AL + PS |
| (Case 1) Time (s) | 225.5 | 8299.4 | 10800 | Total cost (¥) | | | |
| (Case 2) Time (s) | 86.1 | 4658.2 | 10800 | Total cost (¥) | | | |
| (Case 3) Time (s) | 120.6 | 5009.3 | 10800 | Total cost (¥) | | | |
| (Case 4) Time (s) | 240.717 | 8229.1 | 10800 | Total cost (¥) | | | |
|
|