Research Article

Metro Timetabling for Time-Varying Passenger Demand and Congestion at Stations

Table 7

Real-world infrastructure data of Beijing Metro Line 4.

StationMinimum dwell time (s)Maximum dwell time (s)SegmentMinimum travel time (s)Maximum travel time (s)Segment length (m)

1/48 AHQB309011241701363
2/47 BGM309021141561251
3/46 XY309031522091672
4/45 YMY309041181621295
5/44 BDDM3090581111887
6/43 ZGC3090682113900
7/42 HDHZ30907971331063
8/41 RMDX30908961311051
9/40 WGC309091512071658
10/39 NL3090101381901517
11/38 BJZ3090111311801441
12/37 XZM309012931281025
13/36 XJK3090131001381100
14/35 PAL3090141001381100
15/34 XS30901579109869
16/33 LJHT309016921261011
17/32 XD30901774102815
18/31 XWM3090181051441152
19/30 CSK3090191091501200
20/29 TRT3090201492051643
21/28 BJSRS3090211351851480
22/27 MJP30902275103827
23/26 JMX30902390124989
24/25 GYXQ3090----