Research Article

Minimizing the Average Delay at Intersections via Presignals and Speed Control

Table 1

Assumptions for parameters used in the model.

ParametersValues (current situation)Values (after implementing the model)

Duration1 h1 h
Number of buses1212
Number of cars ()800 veh800 veh
Bus headway300 s300 s
Car headway4.5 s4.5 s
Cycle length ()60 s60 s
Red duration ()30 s30 s
Capacity ()800 veh/h800 veh/h
Jam density ()100 veh/km100 veh/km
Initial speed of bus ()20 km/h20 km/h
Initial speed of car ()40 km/h40 km/h
Green duration ()30 s30 s
Time for bus to change lane15 s15 s
Time for bus to reach the stop line15 s15 s
Capacity/density88
83.33 m83.33 m
Distance of VMS for car ()- -22.22 m
Reaction time (t)2 s2 s
- -106 m
Bus travel time ()15 s15 s
Suggested travel time of bus ()30 s30 s
Car travel time ()- -9.5 s
Suggested travel time of car ()- -39.5 s
Suggested speed of car ()- -9.62 km/h
Traffic flow ()800 veh/h800 veh/h
()1.001.00
Initial queue ()10 veh0 veh
Uniform delay ()15 s15 s
Incremental delay ()64 s64 s
Progression adjustment factor (PF)1.6671.667
Initial queue delay ()22.5 s0 s
Delay111.14 s88.64 s
Travel time bus126.14 s103.64 s
Travel time car150.64 s128.14 s
0.50.5
Average car occupancy2 p2 p
Delay/person55.57 s/pp44.32 s/pp