A Simulation-Based Dynamic Programming Method for Interchange Scheduling of Port Collecting and Distributing Network

Table 6

Sensitivity analysis of the construction cost of interchanges.

Construction cost
(million yuan)
Construction SchemeTotal cost (million yuan)
node 1, node 3, and node 4node 2

75100Complete node 2 and 4 in 2016743.872
90120Complete node 2 and 3 in 20181027.465
105140Complete node 3 in 2016, while node 4 in 20181250.370
120160Complete node 2 and 4 in 20221380.727
135180Complete node 2 in 2020, while node 4 in 20221488.410
150200Complete node 3 and 4 in 20201602.452
165220Complete node 2 in 2020, while node 4 in 20221558.410
180240Complete node 3 and 4 in 20222107.794