Research Article
Robust Train Scheduling Problem with Optimized Maintenance Planning on High-Speed Railway Corridors: The China Case
Table 5
The parameters of SDSA-trains.
| No. | Downstream (Beijing → Guangzhou) | Upstream (Guangzhou → Beijing) | Trip | Dep. | Arr. | Trip | Dep. | Arr. |
| 1 | Beijing→Guangzhou | | | Guangzhou→Beijing | | | 2 | Beijing→Guangzhou | | | Guangzhou→Beijing | | | 3 | Beijing→Changsha | | | Guangzhou→Shijiazhuang | | | 4 | Beijing→Guangzhou | | | Guangzhou→Beijing | | | 5 | Shijiazhuang→Guangzhou | | | Changsha→Beijing | | |
|
|