Research Article

Robust Train Scheduling Problem with Optimized Maintenance Planning on High-Speed Railway Corridors: The China Case

Table 5

The parameters of SDSA-trains.

No.Downstream (Beijing → Guangzhou)Upstream (Guangzhou → Beijing)
TripDep.Arr.TripDep.Arr.

1Beijing→GuangzhouGuangzhou→Beijing
2Beijing→GuangzhouGuangzhou→Beijing
3Beijing→ChangshaGuangzhou→Shijiazhuang
4Beijing→Guangzhou Guangzhou→Beijing
5Shijiazhuang→GuangzhouChangsha→Beijing