Research Article

Joint Operating Revenue and Passenger Travel Cost Optimization in Urban Rail Transit

Table 2

Basic information of line 4, phase 1 in Chengdu Metro.

Station IDM1M2M3M4M5M6M7M8

Dwelling Time/s2525252525302525
Section Length/m258521401887215011719859001166
Operation Time/s15413810813974726784

Station IDM9M10M11M12M13M14M15M16

Dwelling Time/s3030303030302525
Section Length/m9721537114075016301560820ā€‰
Operation Time/s71113836110510164ā€‰