The objective function values and the respective optimal train operating speed obtained by the fuzzy multiobjective optimization algorithm.

Value of Value of (m/s) (CNY/train) (CNY/train)

(0.0,1.0)18.3491.509.13
(0.2,0.8)18.3491.509.13
(0.4,0.6)18.3491.509.13
(0.5,0.5)18.3491.509.13
(0.6,0.4)18.3491.509.13
(0.8,0.2)18.3491.509.13
(1.0,0.0)11.5578.6010.77

(0.0,1.0)18.3491.509.13
(0.2,0.8)18.3491.509.13
(0.4,0.6)18.3491.509.13
(0.5,0.5)18.3491.509.13
(0.6,0.4)18.3491.509.13
(0.8,0.2)11.5578.6010.77
(1.0,0.0)11.5578.6010.77

(0.0,1.0)18.3491.509.13
(0.2,0.8)11.5578.6010.77
(0.4,0.6)11.5578.6010.77
(0.5,0.5)11.5578.6010.77
(0.6,0.4)11.5578.6010.77
(0.8,0.2)11.5578.6010.77
(1.0,0.0)11.5578.6010.77

Note: because the optimization result shows that , then we use to express average train operating speed in every section.