Research Article

Joint Operating Revenue and Passenger Travel Cost Optimization in Urban Rail Transit

Table 6

The optimized timetable of OTP.

DownM1M2M3M4M5M6M7M8

Dwell (s)-25252525302525

Arrival(s)-147304431589685784873

Departure(s)0172329456614715809898

ā€‰M9M10M11M12M13M14M15M16

Dwell (s)30303030303025-

Arrival(s)9791076121613261415154616721759

Departure(s)1009110612461356144515761697-

UPM16M15M14M13M12M11M10M9

Dwell time(s)-25303030303030

Arrival(s)-2121224223732462257227122809

Departure(s)20592146227224032492260227422839

ā€‰M8M7M6M5M4M3M2M1

Dwell (s)25253025252525-

Arrival(s)29203009310332043362348936463818

Departure(s)2945303431333229338735143671-