Summary of the three project options assessed in the survey.

HS2 Phase IAlternative 1:  West Coast Main Line upgradeAlternative 2:  High-Speed Rail along M1 motorway

Base investment costca. £20 billion
(£19.4-21.4bn)
ca. £3 billion
(£2.6-3.8bn)
ca. £22 billion
(£2.2bn more than HS2 Phase I)
Journey time between London Euston and Birmingham49 minutes73 minutes
(currently: 85 minutes)
55 minutes
Maximum speed250 mph (=400 kph)140 mph (=225 kph)
(currently: 125mph or 200kph)
186 mph (=300 kph)
(same as HS1 between London and Paris)
Key features(i) New dedicated line from London to Birmingham with no stations in between
(ii) Route avoids major population centres by running mostly through rural areas
(iii) Route passes through Chilterns Area of Outstanding Natural Beauty (AONB)
(i) Line passes through and serves many population centres between London and Birmingham
(ii) Requiring very little additional land
(iii) Some disruption of existing service expected during upgrade
(i) New dedicated line from London to Birmingham with no stations in between
(ii) Route passes through or near many population centres
(iii) Avoids Chilterns Area of Outstanding Natural Beauty (AONB)