Research Article

A Crash Surrogate Metric considering Traffic Flow Dynamics in a Motorway Corridor

Table 3

The traffic flow configuration for each on-ramp and off-ramp.

Traffic scenario1234

LOSA&BCDE
Freeway input (vehs/hr)1830396052206360
Off-ramp 1 output (vehs/r)99 (5.4%)245 (6.1%)298 (5.7%)426 (6.7%)
On-ramp 1 input (vehs/hr)123 (7.1%)238 (6.4%)315 (6.4%)362 (6.1%)
Off-ramp 2 output (vehs/hr)98 (5.3%)233 (5.9%)346 (6.6%)384 (6.1%)
On-ramp 2 input (vehs/hr)114 (6.5%)223 (6.0%)303 (6.2%)414 (7.0%)
Off-ramp 3 output (vehs/hr)135 (7.2%)334 (7.7%)441 (8.5%)512 (8.1%)
On-ramp 3 input (vehs/hr)80 (4.6%)189 (5.2%)304 (6.4%)401 (6.9%)
Study on-ramp input (vehs/hr)136 (7.5%)291 (7.6%)405 (8.0%)466 (7.5%)
Off-ramp 4 output (vehs/hr)123 (6.3%)276 (6.7%)364 (5.2%)488 (7.3%)
On-ramp 5 input (vehs/hr)75 (4.1%)165 (4.3%) 190 (3.9%)279 (4.5%)
Off-ramp 5 output (vehs/hr) 130 (6.8%)281 (7.0%)329 (6.5%)466 (7.2%)