Research Article

Signal Timing Optimization for Corridors with Multiple Highway-Rail Grade Crossings Using Genetic Algorithm

Table 5

Pedestrian phase cutoffs for the scenarios with EB trains.

ā€‰One train in EBThree trains in EBFive trains in EB

33rd St intersectionScenario 0-E-1Scenario 1-E-1Scenario 0-E-3Scenario 1-E-3Scenario 0-E-5Scenario 1-E-5

# of ped cutoffs3508811316
# of ped events5050150150228229
% pedestrian phase cutoffs70.0%0.0%58.7%0.7%57.5%2.6%
Reduction100.098.995.4

35th St intersectionScenario 0-E-1Scenario 1-E-1Scenario 0-E-3Scenario 1-E-3Scenario 0-E-5Scenario 1-E-5

# of ped cutoffs27079211814
# of ped events5050150150231231
% pedestrian phase cutoffs54.0%0.0%52.7%1.3%51.1%6.1%
Reduction100.097.588.1

44th St intersectionScenario 0-E-1Scenario 1-E-1Scenario 0-E-3Scenario 1-E-3Scenario 0-E-5Scenario 1-E-5

# of ped cutoffs28081013315
# of ped events5050143143238238
% pedestrian phase cutoffs56.0%0.0%56.6%0.0%55.6%6.3%
Reduction100.0100.088.7