Research Article
Improving Bus Operations through Integrated Dynamic Holding Control and Schedule Optimization
Table 2
Summary of primary parameters.
| Parameter | Definition |
| | Bus number |
| | Stop number |
| | The amount of buses |
| | The amount of stops |
| | The scheduled arrival time of bus at stop |
| | The actual arrival time of bus at stop |
| | The deviation from scheduled arrival time of bus at stop . |
| | The headway between bus and bus at stop . |
| | The average cruising time between stop and stop . |
| | The random noise in the cruising time of bus between stop and stop |
| | The holding time applied to bus at stop |
| | The amount of slack time inserted in the schedule at stop |
| | The passenger arriving rate at stop |
| | The passenger boarding rate |
| | A dimensionless measure for the demand rate at stop . |
| | The target headway |
|
|