Research Article

Improving Bus Operations through Integrated Dynamic Holding Control and Schedule Optimization

Table 6

Data Inputs for Case Study.
(a)

Fleet SizeBus CapacityLayover TimePassenger Boarding Rate

13 veh80 prs/veh40 min1 s/prs

(b)

NodeAverage Travel Time (s)STD of Travel Time (s)Passenger Arrival Rate (prs/s)Green Time (s)Cycle Length (s)

Stop 10.045

Int 118 (from Stop 1 to Int 1)9.4763187

Stop 2196.290.059

Int 25626.6263179

Int 33917.9933192

Stop 3144.140.056

Int 42713.9280186

Stop 4176.740.029

Int 56124.8385120

Stop 551.150.038

Int 6194.21136182

Int 7266.0148182

Stop 6123.880.024

Int 86925.5236192

Stop 7197.180.021

Int 95323.8888194

Int 10406.49105194

Stop 872.040.050

Int 115010.7694194

Stop 9216.240.081

Int 129235.0870194

Stop 10122.810.063

Int 138228.1984192

Int 143712.5881182

Int 153211.29136182

Stop 11114.580.042

Int 163016.6185120

Int 174113.2948186

Stop 12154.420.113

Int 185520.2868192

Int 194510.2163179

Stop 13134.020.065

Int 204820.1463187

Stop 14
(Terminal)
123.220

Note: Int stands for Intersection.