Research Article
A New Air Traffic Flow Management User-Driven Prioritisation Process for Low Volume Operator in Constraint: Simulations and Results
Table 9
Effect of sequence compression on the AUs actual costs (case study 3).
| AU name | Baseline cost | Optimal cost | Diff. (optim. - base) | % Reduc. (optim. - base) | Actual cost | Diff. (actual - base) | % Reduc. (actual - base) |
| HUB | -29283 | -29283 | 0 | 0.00% | -29890 | -607 | -2.07% | LC1 | -4735 | -4735 | 0 | 0.00% | -5033 | -297 | -6.27% | LC2 | -12471 | -12471 | 0 | 0.00% | -13674 | -1203 | -9.65% | OA1 | -7178 | -7178 | 0 | 0.00% | -7292 | -114 | -1.59% | OA2 | -425 | -317 | 109 | 25.61% | -330 | 95 | 22.34% | OA3 | -1131 | -1131 | 0 | 0.00% | -629 | 502 | 44.38% | OA4 | -811 | -811 | 0 | 0.00% | -168 | 644 | 79.34% | OA5 | -2632 | -1679 | 953 | 36.21% | -1758 | 874 | 33.20% | OA6 | -1658 | -1658 | 0 | 0.00% | -1616 | 42 | 2.53% | OA7 | | | | | | | | OA8 | -4691 | -4691 | 0 | 0.00% | -5204 | -513 | -10.93% |
|
|