Multiobjective Optimization Model for Sustainable Waste Management Network Design

Table 5

Results of single-objective optimization.

ā€‰ā€‰Minimizing CostMinimizing Avg. Land-Use StressMinimizing Public Health Impact

Total Cost (USD)Total transportation cost11,973,20523,519,3469,658,807
Total land cost7,753,6911,854,00721,035,012
Total construction cost17,114,39619,456,13627,692,869
Total operation cost14,103,02319,823,51716,354,068
Total cost50,944,31564,653,00674,740,757
Satisfaction Level100%42%0%

Land-Use ImpactAvg. Land-use Stress0.5730.0280.985
Satisfaction Level43%100%0%

Public Health Impact (DALY)Transportation13,04247,8686,214
Waste Facilities31,63910,0721,010
Total Public Health Impact44,68157,9407,224
Satisfaction Level26%0%100%

Average Satisfaction Level56%47%33%

Computational Time (Sec.)241013