Research Article

Integrated Optimization of Tram Schedule and Signal Priority at Intersections to Minimize Person Delay

Table 4

Traffic volume and signal timings.

IntersectionTraffic flow
(Number of Lane)
Split
(Cycle 180 sec)
IntersectionTraffic flow
(Number of Lane)
Split
(Cycle 180 sec)
LeftThroughRightLeftThroughLeftThroughRightLeftThrough

S1South152(1)1020(2)88(1)2590S2South148(1)1084(2)96(1)2290
North147(1)1016(2)44(1)2590North153(1)1096(2)2(1)2290
East144(1)512(2)372(2)2342East148(1)527(2)212(2)2345
West142(1)492(2)16(1)2342West146(1)518(2)16(1)2345