Research Article
A Hybrid Simulated Annealing Heuristic for Multistage Heterogeneous Fleet Scheduling with Fleet Sizing Decisions
Table 1
Performance for CPLEX, GHP, and HSAH applied to small size problem with no time limit imposed.
| Problem size (freight terminal × vehicle types × time period) | CPLEX | GHP | HSAH | OS | CPU time | OFV | CPU time | RAT | GAP | OFV | CPU time | RAT | GAP | (RMB) | (second) | (RMB) | (second) | (%) | (second) | (RMB) | (second) | (%) | (second) |
| | 219586 | 214.5 | 165894 | 13.6 | 24.45 | 200.9 | 199473 | 33.6 | 9.16 | 180.9 | | 225465 | 235.7 | 184759 | 15.7 | 18.05 | 220.0 | 209484 | 37.5 | 7.09 | 198.2 | | 230187 | 356.2 | 163028 | 13.9 | 29.18 | 342.3 | 190583 | 36.6 | 17.21 | 319.6 | | 246586 | 248.3 | 190324 | 21.6 | 22.82 | 226.7 | 224756 | 45.6 | 8.85 | 202.7 | | 250829 | 321.2 | 186206 | 25.8 | 25.76 | 295.4 | 208573 | 50.4 | 16.85 | 270.8 | | 276585 | 314.5 | 201478 | 23.1 | 27.16 | 291.4 | 235859 | 55.6 | 14.72 | 258.9 |
|
|