Research Article
A Hybrid Simulated Annealing Heuristic for Multistage Heterogeneous Fleet Scheduling with Fleet Sizing Decisions
Table 2
Performance for CPLEX, GHP, and HSAH applied to medium size problem with no time limit imposed.
| Problem size (freight terminal × vehicle types × time period) | CPLEX | GHP | HSAH | OS | CPU time | OFV | CPU time | RAT | GAP | OFV | CPU time | RAT | GAP | (RMB) | (second) | (RMB) | (second) | (%) | (second) | (RMB) | (second) | (%) | (second) |
| | 727865 | 389.5 | 512034 | 89.7 | 29.65 | 299.8 | 708543 | 196.7 | 2.65 | 192.8 | | 767289 | 397.2 | 536401 | 91.4 | 30.09 | 305.8 | 741478 | 183.4 | 3.36 | 213.8 | | 876537 | 405.7 | 641963 | 103.4 | 26.76 | 302.3 | 835317 | 209.9 | 4.70 | 195.8 | | 782685 | 412.3 | 541069 | 113.5 | 30.87 | 298.8 | 729294 | 220.3 | 6.82 | 192.0 | | 813858 | 434.2 | 571648 | 73.8 | 29.76 | 360.4 | 787625 | 177.8 | 3.22 | 256.4 | | 882385 | 451.8 | 642917 | 112.5 | 27.13 | 339.3 | 837674 | 229.6 | 5.07 | 222.2 | | 926048 | 446.9 | 702541 | 100.9 | 24.14 | 346.0 | 892573 | 214.2 | 3.61 | 232.7 | | 949874 | 467.1 | 731529 | 85.2 | 22.99 | 381.9 | 932074 | 192.1 | 1.87 | 275.0 | | 998375 | 482.6 | 768359 | 78.4 | 23.04 | 404.2 | 948927 | 187.4 | 4.95 | 295.2 | | 1010948 | 513.7 | 763542 | 104.3 | 24.47 | 409.4 | 978375 | 210.6 | 3.22 | 303.1 |
|
|