Research Article
Investigation on Two-Stop-Line Signalized Roundabout: Capacity and Optimal Cycle Length
Table 1
Variable notations in this research.
| Variable notations | Description | Unit |
| | Capacity of one through lane at the 1st stop line | pcu/h | | Capacity of one left-turn lane at the 1st stop line | pcu/h | | Capacity of one left-turn lane at the 2nd stop line | pcu/h | | Overall capacity of one left-turn lane | pcu/h | | Overall capacity of one direction approach | pcu/h | | Saturation flow of one through lane at the 1st stop line | pcu/h | | Saturation flow of one left-turn lane at the 1st stop line | pcu/h | | Effective green time for through traffic flow | s | | Effective green time for left-turn traffic flow at 1st stop line | s | | Cycle length of the traffic signal | s | | Optimal cycle length of the traffic signal | s | | Vehicle-storage capacity of and part of queueing area | pcu | | Number of circulatory lanes assigned to left-turn traffic flow during phase P-2 | ā | | Total number of circulatory lanes excluding right-turn lane | ā | | Radian of the 1st part of queuing area | rad | | Radian of the 2nd part of queuing area | rad | | Radius of the central island | m | | Radius of circulatory lane | m | | Average parking space for a vehicle, normally is 6 | m | | Traffic volume of lane | pcu/h | | Average traffic delay of lane | s |
|
|