Research Article

Integrating Frequency Setting, Timetabling, and Route Assignment to Synchronize Transit Lines

Table 3

Numerical results for scenarios B.

Costs ($)

Operation1,703,8061,818,9611,703,8191,809,9061,703,819
Trips2,182,6962,182,7002,182,7002,191,5302,197,770
Walk19,63619,63619,63632,85242,129
Holding0189,4100159,5430
First wait2,221,525710,4541,364,490655,0351,181,050
Transfer wait272,466102,540119,573113,576156,266

Total Cost6,400,1295,032,7015,390,2184,962,4425,281,034