Control results under different cost constraints.
| Scheme | Controlled risk source | Cost constraint | Risk level of P1 |
| 1 | P1, P2, P3, P4 | 700,000 Yuan/year | 0.5090 | 2 | P1, P2, P3, P4, P8 | 900,000 Yuan/year | 0.4143 | 3 | P13, P10, P1, P2, P3, P4, P5, P8 | 1150,000 Yuan/year | 0.3801 |
|
|