Research Article
An Estimation Model on Electricity Consumption of New Metro Stations
Table 6
Predicted results of SVR model, BP neural model and MLR model.
| Model | Prediction value | Prediction result | CC | RRMSE (%) | Maximum APE (%) | Average SD (×106 kWh) | Maximum SD (×106 kWh) |
| SVR | 0.89 | 1.39 | 2.28 | 0.166 | 0.204 | BPNN | 0.75 | 2.86 | 4.67 | 0.345 | 0.465 | MLR | 0.61 | 2.27 | 5.19 | — | — |
|
|