Research Article
An Estimation Model on Electricity Consumption of New Metro Stations
Table 7
Comparison between five-fold cross-validation method and hold-out validation method.
| Method | Prediction value | Prediction result | CC | RRMSE (%) | Maximum APE (%) | Average SD (×106 kWh) | Maximum SD (×106 kWh) |
| Five-fold cross-validation | 0.89 | 1.39 | 2.28 | 0.89 | 0.204 | Hold-out validation | Sample set A | 0.83 | 5.76 | 7.95 | 0.83 | 0.538 | Sample set B | 0.65 | 4.01 | 9.26 | 0.65 | 0.613 |
|
|