Research Article
Containerships Sailing Speed and Fleet Deployment Optimization under a Time-Based Differentiated Freight Rate Strategy
Table 5
Results obtained by the proposed optimization model under FFRS and TDFRS.
| Freight rate strategy | Routes | Sailing speed (knots) | Number of containerships | Voyage time (hr) | Profit of each route (USD) | Total profit (USD) | Leg 1 | Leg 2 | Leg 3 | Leg 4 | Leg 5 | Leg 6 |
| FFRS | 1 | 19.8 | 19.9 | 20.0 | 19.7 | 19.9 | — | 5 | 840 | 10 949 979 | 49 934 590 | 2 | 19.7 | 19.5 | 19.6 | 20.0 | 19.7 | 19.8 | 5 | 840 | 10 161 789 | 3 | 18.0 | 19.5 | 19.2 | 18.0 | 18.0 | — | 5 | 803 | 11 209 699 | 4 | 18.2 | 18.2 | 18.5 | 19.0 | 18.3 | 18.3 | 5 | 840 | 17 613 123 | TDFRS | | 1 | 19.8 | 19.9 | 20.2 | 19.7 | 19.7 | — | 5 | 840 | 10 950 651 | 49 948 395 | 2 | 19.7 | 19.5 | 19.6 | 20.7 | 19.7 | 19.0 | 5 | 840 | 10 162 840 | 3 | 18.0 | 19.5 | 19.2 | 18.0 | 18.0 | — | 5 | 803 | 11 209 699 | 4 | 18.2 | 18.2 | 18.5 | 19.8 | 18.3 | 19.3 | 5 | 811 | 17 625 205 | | 1 | 19.8 | 19.9 | 24.6 | 19.7 | 23.7 | — | 5 | 745 | 11 202 298 | 51 697 312 | 2 | 19.7 | 19.5 | 19.6 | 23.4 | 19.7 | 21.8 | 5 | 777 | 10 271 035 | 3 | 18.0 | 19.5 | 24.2 | 18.0 | 23.4 | — | 4 | 672 | 11 745 238 | 4 | 18.2 | 18.2 | 18.5 | 25.6 | 18.3 | 25.0 | 4 | 671 | 18 478 741 |
|
|
Note. represents the optimal results. |