Research Article

A Matheuristic Iterative Approach for Profit-Oriented Line Planning Applied to the Chinese High-Speed Railway Network

Figure 1

The infrastructure of the small example network (a); an example line plan with two lines (b); the corresponding TSN for this line plan (c).
(a)
(b)
(c)