Research Article
A Matheuristic Iterative Approach for Profit-Oriented Line Planning Applied to the Chinese High-Speed Railway Network
Figure 1
The infrastructure of the small example network (a); an example line plan with two lines (b); the corresponding TSN for this line plan (c).
(a) |
(b) |
(c) |