Research Article

A Matheuristic Iterative Approach for Profit-Oriented Line Planning Applied to the Chinese High-Speed Railway Network

Table 10

Results of MHIA and MILP (with a given line pool) for the small HSR network.

PDSBS ()ACT (s)LinesGap (%)

MHIA13.9411351.0
23.7411840.8
33.559150.6

MILP13.98261,4458
23.7754128
33.5768577