Research Article
A Matheuristic Iterative Approach for Profit-Oriented Line Planning Applied to the Chinese High-Speed Railway Network
Table 12
Results of the given line pool for MILP on medium and large HSR networks.
| HSR networks | Approaches | PDS | BS () | ACT (min) | Lines | Gap (%) |
| Medium | MILP | 1 | 2.40 | 2.7 | 12 (16) | — | 2 | 2.50 | 534.7 | 25 (34) | — | 3 | 2.37 | 5.3 | 17 (25) | — | MHIA | 1 | 2.45 | 172 | 7 | −2.0 | 2 | 2.40 | 214 | 7 | 4.0 | 3 | 2.35 | 175 | 9 | 0.8 |
| Large | MILP | 1 | 6.69 | 6.6 | 17 (17) | — | 2 | 6.94 | 53 | 24 (27) | — | 3 | — | — | (36) | — | MHIA | 1 | 6.79 | 246 | 11 | −1.5 | 2 | 6.86 | 288 | 11 | 1.2 | 3 | 6.25 | 312 | 11 | — |
|
|