Research Article
Resilient Schedule Coordination for a Bus Transit Corridor
Table 2
Comparison of different operation methods at average passenger flows.
| Variables | Planned operation | Uncoordinated operation | Coordinated operation (avg. passenger volume) | Coordinated operation (max passenger volume) | Resilience optimized operation |
| | 3 | 3.051 | 4 | 3 | 4 | | 10 | 9.887 | 12 | 9 | 8 | | 30 | 28.169 | 28 | 27 | 28 | | — | — | 1.00 | 1.00 | 1.00 | | — | — | 2.00 | 1.00 | 2.00 | | — | — | 2.00 | 2.00 | 2.00 | | 137.096 | 144.316 | 146.316 | 151.373 | 148.387 | | 17.212 | 10.143 | 6.562 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | | 166.537 | 135.103 | 131.004 | 128.143 | 129.097 | | 303.633 | 279.419 | 277.320 | 279.516 | 277.320 | | — | — | 5.136 | 5.193 | 5.198 | | — | — | 7.184 | 7.091 | 7.077 | | — | — | 11.213 | 11.392 | 11.432 | | — | — | 3.123 | 3.431 | 3.308 | | 30.151 | 28.193 | 26.656 | 27.107 | 26.656 | | 333.784 | 307.612 | 303.976 | 306.623 | 304.499 | R | 0.916 | 0.930 | 0.948 | 0.942 | 0.964 |
|
|