Research Article
Resilient Schedule Coordination for a Bus Transit Corridor
Table 3
Comparison of different operation methods after restructuring routes.
| Variables | Planned operation | Uncoordinated operation | Coordinated operation (avg. passenger volume) | Coordinated operation (max passenger volume) | Resilience optimized operation |
| | 4 | 3.801 | 4 | 3 | 4 | | 11 | 11.150 | 12 | 9 | 8 | | 15 | 14.731 | 16 | 12 | 16 | | — | — | 0.50 | 1.00 | 0.50 | | — | — | 1.00 | 0.50 | 1.00 | | — | — | 1.00 | 0.50 | 0.50 | | — | — | 1.00 | 1.00 | 1.00 | | 157.116 | 162.210 | 170.310 | 171.310 | 171.145 | | 16.211 | 11.312 | 7.143 | 0 | 0 | | 5 | 3 | 2 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | | 0 | 0 | 0 | 0 | 0 | | 173.342 | 158.332 | 149.433 | 148.707 | 149.067 | | 330.458 | 320.542 | 319.743 | 320.017 | 320.212 | | — | — | 5.973 | 6.854 | 6.104 | | — | — | 6.985 | 7.013 | 6.847 | | — | — | 12.211 | 12.610 | 12.146 | | — | — | 4.016 | 4.123 | 4.073 | | 36.131 | 31.631 | 29.185 | 30.600 | 29.170 | | 366.589 | 352.173 | 348.928 | 350.617 | 349.382 | R | 0.874 | 0.921 | 0.944 | 0.939 | 0.957 |
|
|