Research Article

Resilient Schedule Coordination for a Bus Transit Corridor

Table 3

Comparison of different operation methods after restructuring routes.

VariablesPlanned operationUncoordinated operationCoordinated operation (avg. passenger volume)Coordinated operation (max passenger volume)Resilience optimized operation

43.801434
1111.1501298
1514.731161216
0.501.000.50
1.000.501.00
1.000.500.50
1.001.001.00
157.116162.210170.310171.310171.145
16.21111.3127.14300
53200
00000
00000
173.342158.332149.433148.707149.067
330.458320.542319.743320.017320.212
5.9736.8546.104
6.9857.0136.847
12.21112.61012.146
4.0164.1234.073
36.13131.63129.18530.60029.170
366.589352.173348.928350.617349.382
R0.8740.9210.9440.9390.957