Research Article

A Fast Approach for Reoptimization of Railway Train Platforming in Case of Train Delays

Table 7

Input parameters of the model.

ParameterValue

Maximum value of dwell times of all trains 43 min
Length of the planning horizon 360 min
Safety time interval for platform track operation 6 min
Sum of the length of the planning horizon and the safety time interval for platform track operation 366 min
Headway between two arrival trains 5 min
Headway between two departure trains 5 min
Objective function weighting factor 200