Results of the test instances for the ERCSLP.

InstanceLength (km)# nodes# CS% of nodes with CSBat. capacity (kWh)% of battery usedObj. function% of cost due to CS% of cost due to batteryCPU time (S)Cost with fuel ($)SCC ($)Total cost fuel ($)Relative difference (%)Required price for fuel3

Caqueta31031417.15234.740,92561.938.1130.541,8068,73450,54019.0NA
Magdalena31149111.15536.741,86160.639.4226.839,6428,28247,92412.7NA
Magdalena41161119.15536.741,85960.639.4757.141,6128,69350,30516.8NA
Guaviare21211119.15234.742,41463.236.852.741,6498,70150,35015.8NA
Magdalena21451119.17248.048,57055.544.5361.643,3149,04952,3637.2NA
Caqueta21722114.814496.070,21138.561.5552.540,5658,47449,039−43.24.3
Magdalena11741715.910570.058,44746.153.9291.849,97710,44160,4183.3NA
Caqueta12106350.06442.798,24580.519.547.982,64917,26699,9151.7NA
Guaviare27315320.07147.397,18678.121.9547.157,85412,08669,941−39.04.2
Amazonas4829444.47348.7126,30782.717.372.778,96616,49795,463−32.34.0
Putumayo57615746.77550.0201,11788.811.21010.773,14715,28188,428−127.46.8
Orinoco65313861.512180.7248,36985.414.6166.481,85617,10098,956−151.07.5

Min103614.85234.740,92538.511.247.939,6428,28247,924−151.04.0
Average26212.72.723.278.352.292,95966.833.2351.556,08611,71767,803−26.45.4
Max65321861.514496.0248,36988.861.51010.782,64917,26699,91519.07.5

3NA indicates that the EB investment cost is lower than the ICB operation cost.