Parameter settings for the case study.

NotationsMeaningSettings

Total battery capacity324 kWh
Ratio of the permitted maximum SOC to total battery capacity0.95
Ratio of the permitted minimum SOC to total battery capacity0.25
Charging power of the charger1.8 kWh/min
Power consumption rate during operation0.65 kWh/min
Purchasing and maintenance conversion cost of an EB1,500,000 RMB
Purchasing and maintenance conversion cost per charger450,000 RMB