Research Article
Optimal Electric Bus Scheduling under Travel Time Uncertainty: A Robust Model and Solution Method
Table 3
Computational results of the MIP model and BP on single-route instances.
| Number of trips | | Obj | #V | Gap (%) | Run time (s) | MIP | BP | BP | MIP | BP | Cplex | BP |
| 62 | 0 | 16916.5 | 16912.8 | 16 | 5.4 | 0 | 3600 | 0 | | 1 | 18107.3 | 16400.0 | 16 | 11.64 | 0 | 3600 | 1 | | 2 | 19876.8 | 16800.0 | 16 | 19.50 | 0 | 3600 | 1 | | 3 | 21763.3 | 17000.0 | 17 | 26.48 | 0.12 | 3600 | 1 | 96 | 0 | 22900.7 | 22676.7 | 21 | 8.30 | 0.14 | 3600 | 8 | | 1 | 25664.7 | 25504.5 | 22 | 18.18 | 0.21 | 3600 | 5 | | 2 | 30395.0 | 27279.2 | 22 | 30.91 | 0.21 | 3600 | 6 | | 3 | 35098.3 | 33331.9 | 22 | 40.17 | 0.26 | 3600 | 8 | 112 | 0 | 26294.3 | 25711.1 | 23 | 12.53 | 0.42 | 3600 | 10 | | 1 | 30508.7 | 26714.7 | 24 | 24.61 | 0.60 | 3600 | 7 | | 2 | 36842.2 | 30202.2 | 24 | 37.57 | 0.58 | 3600 | 8 | | 3 | 51072.5 | 33858.5 | 24 | 54.97 | 0.71 | 3600 | 10 | 154 | 0 | 38082.3 | 36578.7 | 33 | 13.35 | 0.20 | 3600 | 24 | | 1 | 69344.3 | 37041.8 | 33 | 52.41 | 0.22 | 3600 | 34 | | 2 | (33000) | 42180.0 | 33 | — | 0.68 | — | 56 | | 3 | (33000) | 45606.0 | 33 | — | 0.84 | — | 13 | 276 | 0 | (49000) | 56443.3 | 49 | — | 0.82 | — | 129 | | 1 | (49000) | 67309.1 | 49 | — | 0.86 | — | 169 | | 2 | — | 82386.7 | 49 | — | 1.02 | — | 191 | | 3 | — | 99134.4 | 49 | — | 0.92 | — | 113 |
|
|