Research Article
Multidepot Recycling Vehicle Routing Problem with Resource Sharing and Time Window Assignment
Table 1
Comparison of before and after RS and TWA.
| Case | TC ($) | Recycling cost ($) | Penalty cost ($) | AT | AC ($) | TNV | TNS | MC ($) | Total cost ($) |
| Nonoptimal logistics network | — | 1760 | 1080 | — | — | 9 | — | 1800 | 4640 | Optimal logistics with RS and TWA | 990 | 1400 | 400 | 56 | 280 | 4 | 1 | 1100 | 4170 |
|
|