Research Article

Multidepot Recycling Vehicle Routing Problem with Resource Sharing and Time Window Assignment

Table 9

Comparison of the results before and after optimization.

ScenariosTransportation cost ($)Penalty cost ($)Assignment cost ($)Fixed cost ($)Number of semitrailer trucksNumber of vehiclesTotal cost ($)

Before optimization46756000ā€”6350ā€”2138025
After optimization13071566215063502721373