Research Article

Multiscenario-Based Train Headway Analysis under Virtual Coupling System

Table 6

Scenario-related parameters for CTCS-3 and VC system.

Scenario-related parameterValue

0.000103
0.0066
0.42
Length of the first exit block section1045 m
Max train speed300 
Station safety margin110 m
Turnout numberNo. 18
Turnout speed80 
Distance between the train parking and exit signal65 m
Arrival operation time (CTCS-3)40 s
Arrival operation time (VC system)35 s
Departure operation time (CTCS-3)51 s
Departure operation time (VC system)46 s
Passing operation time (CTCS-3)25 s
Passing operation time (VC system)20 s