Research Article
Multiscenario-Based Train Headway Analysis under Virtual Coupling System
Table 6
Scenario-related parameters for CTCS-3 and VC system.
| Scenario-related parameter | Value |
| | 0.000103 | | 0.0066 | | 0.42 | Length of the first exit block section | 1045 m | Max train speed | 300 | Station safety margin | 110 m | Turnout number | No. 18 | Turnout speed | 80 | Distance between the train parking and exit signal | 65 m | Arrival operation time (CTCS-3) | 40 s | Arrival operation time (VC system) | 35 s | Departure operation time (CTCS-3) | 51 s | Departure operation time (VC system) | 46 s | Passing operation time (CTCS-3) | 25 s | Passing operation time (VC system) | 20 s |
|
|