Research Article
Signal Control Strategy for Supersaturated Traffic at Urban Road Intersections with a Large Technical Grade Gap
Table 7
Comparison of queue length and delay at the intersection before and after signal timing optimization.
| Entrance | Length of road (m) | Average queue length | Average delay per vehicle of the approaches | Average delay per vehicle of the intersection | Before optimization (m) | After optimization (m) | Variation (%) | Before optimization (s) | After optimization (s) | Variation (%) | Before optimization (s) | After optimization (s) | Variation (%) |
| West entrance | 600 | 511 | 350 | −31.5% | 48.07 | 39.94 | −16.91 | 38.22 | 40.68 | 6.44 | East entrance | 600 | 332 | 166 | −50% | 45.49 | 37.78 | −16.95 | South entrance | 1100 | 191 | 207 | 8.4% | 35.70 | 45.49 | 16.67 | North entrance | 1200 | 166 | 185 | 11.4% | 34.93 | 40.77 | 16.72 |
|
|