Research Article
A Balanced Strategy for the FFBS Operator Integrating Dispatch Area, Route, and Depot Based on Multimodel Technologies
Table 7
The scheduling cost of different division groups of the dispatch area in Luohu District.
| Dispatch division | Subdispatch area | Depot grid | Truck number | Route length (km) | Demand satisfaction (%) |
| CD | 1 | 913 | 3 | 20.80 | 91.04 | 2 | 3128 | 7 | 109.92 | 89.80 | 3 | 6221 | 6 | 64.01 | 86.37 | 4 | 9764 | 2 | 38.50 | 93.99 | Total | 18 | 233.23 | 90.3 |
| M1 | 1 | 6122 | 9 | 119.85 | 87.27 | 2 | 1972 | 4 | 48.71 | 85.91 | 3 | 8237 | 2 | 30.21 | 96.77 | 4 | 223 | 4 | 60.09 | 95.62 | Total | 19 | 258.87 | 91.39 |
| M2 | 1 | 5817 | 9 | 113.64 | 88.58 | 2 | 930 | 4 | 57.00 | 92.77 | 3 | 5307 | 2 | 28.75 | 95.93 | 4 | 7356 | 4 | 49.81 | 93.56 | Total | 19 | 249.20 | 92.71 |
|
|
CD: community detection; M1: manual group 1; M2: manual group 2.
|