Research Article
Two-Phase Optimization Models for Liner Shipping Network Based on Hub Ports Cooperation: From the Perspective of Supply-Side Reform in China
Table 1
Notations of model in NA phase.
| Sets | N | Set of all nodes in the LSNs | H | Set of all traditional hub ports (THP) | R | Set of all emerging hub ports (EHP) | O | Set of all origin ports of demands | D | Set of all destination ports of demands | V | Set of all available legs in the LSNs |
| Parameters | π | Capacity of any deployed containership | | Voyage expense of operating on leg (i1, i2) ∊ V | | Transit time of operating on leg (i1, i2) ∊ V | Ω | Maximum containership capacity for a voyage circle controlled by the government | Qod | Quantity of demand between origin port o ∊ O ⊆ N and destination port d ∊ D ⊆ N | eod | Freight rate of transporting unit demand between origin port o ∊ O ⊆ N and destination port d ∊ D ⊆ N | E | Expected total revenue, which can be calculated as | W | Fixed transit time for the total legs in a voyage cycle |
| Decision variables | | (Binary) 1 iff the leg (i1, i2) exists | | The number of containers to be transported on leg (i1, i2) ∊ V | z | The number of deployed containerships |
|
|