Research Article

An Exact Solution Approach for the Bus Line Planning Problem with Integrated Passenger Routing

Table 1

Optimal solutions for Mandl’s Swiss network with at most 8 nodes per line.

Number of linesMax nodes per lineTTT (min)ATT (min)CPU time (s)Solutions checked (M)

3816945010.8813<1
416321010.4829715
516045010.313317466
615850010.18188563785
715726010.10397536737
815675010.0716190225704
915630010.0420087224934
1015594010.02292964032
1115585010.01170541369
1215582010.01163201044
1315580010.01248831634
1415579010.011019177