Research Article

Lane Change Control Combined with Ramp Metering: A Strategy to Manage Delays at On-Ramp Merging Sections

Figure 6

Pace (h/km) contour plots for the mainline. (a) No-control. (b) Ramp metering. (c) Lane change. (d) Lane change+Ramp metering