Research Article

Route Selection of Multimodal Transport Based on China Railway Transportation

Table 5

Transit cost and transit time of transit node.

TransitRail transportRoad transportAir transport
Cost (yuan/t)Time (h/t)Cost (yuan/t)Time (h/t)Cost (yuan/t)Time (h/t)

Rail transport120.01120.02
Road transport100.01150.03
Air transport120.02150.03

Note. The unit of transit cost is yuan/t; and the unit of transit time is h/t.