Research Article
A Long-Term Shared Autonomous Vehicle System Design Problem considering Relocation and Pricing
Table 2
Variables and parameters used in the long-term planning of the SAV system.
| Notations | Description |
| Parameters | K | Set of the planning periods, indexed as | | Unit construction cost for a station at zone i | | Unit construction cost for a parking space at zone | | Unit purchase cost for an SAV in k-th periods | | Interest rate | | Discount factor in the k-th planning period | | The total number of operational days in a year | | The maximum number of parking spaces at zone |
| Decision variables | | If there is a station built at zone at the beginning of k-th period | | The number of parking spaces at zone at the beginning of k-th period | | The total fleet size at zone at the beginning of k-th period |
|
|