Research Article

A Long-Term Shared Autonomous Vehicle System Design Problem considering Relocation and Pricing

Table 2

Variables and parameters used in the long-term planning of the SAV system.

NotationsDescription

Parameters
KSet of the planning periods, indexed as
Unit construction cost for a station at zone i
Unit construction cost for a parking space at zone
Unit purchase cost for an SAV in k-th periods
Interest rate
Discount factor in the k-th planning period
The total number of operational days in a year
The maximum number of parking spaces at zone

Decision variables
If there is a station built at zone at the beginning of k-th period
The number of parking spaces at zone at the beginning of k-th period
The total fleet size at zone at the beginning of k-th period