Research Article

Optimization of the Reversible Lane considering the Relationship between Traffic Capacity and Number of Lanes

Table 4

Route travel time before and after optimization.

OD pairRoute/in node orderRoute travel time/sTotal time/s
BeforeAfterDifferenceBeforeAfterDifference

(1,4)1–2–4186.8155.5−31.3851808709080−142728
1–2–3–4270.8238.6−32.2
1–3–4186.8155.5−31.3
1–3–2–4186.8155.5−31.3
(4,1)4–2–1150.1154.64.51365911406864095
4–2–3–1151.3155.23.9
4–3–1150.1154.64.5
4–3–2–1232.9237.24.3
(2,3)2–341.241.80.63213632604468
2–4–3166.7155.0−11.7
2–1–3167.3155.0−12.3
(3,2)3–242.941.4−1.54847746782−1695
3–1–2150.1154.64.5
3–4–2169.5155.1−14.4