Research Article
Optimization of the Reversible Lane considering the Relationship between Traffic Capacity and Number of Lanes
Table 4
Route travel time before and after optimization.
| OD pair | Route/in node order | Route travel time/s | Total time/s | Before | After | Difference | Before | After | Difference |
| (1,4) | 1–2–4 | 186.8 | 155.5 | −31.3 | 851808 | 709080 | −142728 | 1–2–3–4 | 270.8 | 238.6 | −32.2 | 1–3–4 | 186.8 | 155.5 | −31.3 | 1–3–2–4 | 186.8 | 155.5 | −31.3 | (4,1) | 4–2–1 | 150.1 | 154.6 | 4.5 | 136591 | 140686 | 4095 | 4–2–3–1 | 151.3 | 155.2 | 3.9 | 4–3–1 | 150.1 | 154.6 | 4.5 | 4–3–2–1 | 232.9 | 237.2 | 4.3 | (2,3) | 2–3 | 41.2 | 41.8 | 0.6 | 32136 | 32604 | 468 | 2–4–3 | 166.7 | 155.0 | −11.7 | 2–1–3 | 167.3 | 155.0 | −12.3 | (3,2) | 3–2 | 42.9 | 41.4 | −1.5 | 48477 | 46782 | −1695 | 3–1–2 | 150.1 | 154.6 | 4.5 | 3–4–2 | 169.5 | 155.1 | −14.4 |
|
|