Research Article

Optimizing Intermodal Transport and Hub Location Problem for ECOWAS in the Context of Improving Intra-African Trade

Table 5

Handling cost and set up cost by World Bank (2020).

Hub candidateHandling cost ($/(h ))Set-up cost ($)

Sekondi Takoradi0.378685,189.97
Lagos0.468382,291.02
Accra0.375685,189.97
Conakry0.404237,360.52
Kumasi0.375885,189.97
Bouake0.880884,456.78
Ibadan0.468382,291.02
Thies4.545875,776.70
Lome0.780834, 626.57
Monrovia1.178325,026.38