Research Article
The Integration of Multimodal Networks: The Generalized Modal Split and Collaborative Optimization of Transportation Hubs
Table 7
Results of three schemes.
| Scheme | Parking lot | Bus routes | Number of buses | Bus frequency | Total time | Construction cost | Modal shift | Service level |
| Original | 5 | 21-22-23-24-25 | 5 | 0.0678 | 296.2606 | — | — | 478.1152 | GA1 | 5, 6 | 26-27-28–29 | 2 | 0.2494 | 288.2229 | 25187.08 | −17.5560 | 443.0906 | 21-22-23-24-25 | 3 | 0.113 | HGSADC | 5 | 26-27-28-29-30 | 3 | 0.1130 | 282.1800 | 30084.72 | −28.6002 | 405.3683 | 21-22-23-24-25 | 2 | 0.1694 |
|
|