Research Article
Evaluation of the Cost of Intelligent Upgrades of Transportation Infrastructure for Intelligent Connected Vehicles
Table 2
Attribute parameters of the closed highway scenario.
| Parameter | Value |
| Road length (km) | 148.2 | Traffic flow in one lane (number of vehicles/m) | 0.02 | Number of lanes (two directions) | 6 | The year construction started | 1998 | Investment | ¥3,000,000,000 |
|
|