| Number of AGVs employed | Total loading time (s) | Reduction rate for the loading time compared with the previous number of AGVs (%) | Average waiting time within the external ramp (s) |
| 10 | 267,469.00 | | 0.1728 | 11 | 243,316.00 | −9.03 | 0.2207 | 12 | 223,131.00 | −8.30 | 0.3075 | 13 | 206,215.00 | −7.58 | 0.3487 | 14 | 191,658.00 | −7.06 | 0.4306 | 15 | 179,118.00 | −6.54 | 0.5182 | 16 | 168,065.00 | −6.17 | 0.6281 | 17 | 158,403.00 | −5.75 | 0.7933 | 18 | 149,761.00 | −5.46 | 0.9676 | 19 | 142,008.00 | −5.18 | 1.1023 | 20 | 135,208.00 | −4.79 | 1.3167 | 21 | 129,067.00 | −4.54 | 1.6814 | 22 | 123,464.00 | −4.34 | 1.9076 | 23 | 118,218.00 | −4.25 | 2.0848 | 24 | 113,642.00 | −3.87 | 2.4887 | 25 | 109,490.00 | −3.65 | 2.9827 | 26 | 105,628.00 | −3.53 | 3.3725 | 27 | 102,098.00 | −3.34 | 4.2814 | 28 | 99,278.00 | −2.76 | 5.7039 | 29 | 96,806.00 | −2.49 | 7.4914 | 30 | 94,520.00 | −2.36 | 9.3743 | 31 | 92,593.00 | −2.04 | 11.8527 | 32 | 90,984.00 | −1.74 | 14.9762 | 33 | 89,737.00 | −1.37 | 18.3850 | 34 | 89,063.00 | −0.75 | 23.2587 | 35 | 88,376.00 | −0.77 | 27.2625 | 36 | 88,117.00 | −0.29 | 32.9849 | 37 | 87,877.00 | −0.27 | 38.2575 | 38 | 87,626.00 | −0.29 | 43.9438 | 39 | 87,475.00 | −0.17 | 49.4631 | 40 | 87,394.00 | −0.09 | 54.4195 |
|
|