Research Article

Optimization of Bus Scheduling and Bus-Berth Matching at Curbside Stops under Connected Vehicle Environment

Table 4

Schedule delays (s).

Schedule delays (s)Bus 1Bus 2Bus 3Bus 4Bus 5Bus 6AverageReduction (%)

M031030130140131330722.17ā€”
M1347On timeOn time327302On time12.6742.9%
M2347On timeOn time327On timeOn time12.3344.4%