Research Article

Two Stop-Line Method for Modern T-Shape Roundabout: Evaluation of Capacity and Optimal Signal Cycle

Figure 5

Optimal signal cycle length with respect to inscribed island radius and Aimsun simulator. (a) Aimsun Next simulator. (b) Optimal signal cycles’ lengths.
(a)
(b)